Outdoor Play Area and Community Garden

The Library is excited to announce that in late 2024 we were awarded a Community Resiliency, Economic Sustainability, and Technology (CREST) Grant to create an outdoor Children’s Play Area and Community Garden Space. The Library would like to thank retired Assemblyman Fred Thiele for his assistance in securing this $125,000 grant.  Careful budgeting has allowed the library to proceed with this project without asking the taxpayers for a bond.

11/18/2025

We are excited to see the play area coming together!  Only a few, final touchups are left!

View from the sensory path, over the bridge and to the pergola

View from the sensory path, over the bridge and to the pergola


View of the play area from the front door towards the Children's Activity room

View of the play area from the front door towards the Children’s Activity room


Aerial view of the play area

Aerial view of the play area

11/3/2025

We are excited to see the play area coming together.  The pergola has been installed along with a sensory path and some toys.  Fake grass and a special, ADA-compliant mulch is being installed this week.  More toys will be installed this week and we anticipate opening the area up next week!

Sensory path with 2 of the three textures installed.

Pergola has been installed in the corner of the play area

Play area with flowers, grass, and sensory path. Toys will be installed here

The Community Garden has been paved and fence posts installed and ready for fencing.

The Community Garden has been paved and fence posts installed and ready for fencing.

10/9/2025

The entrance from the parking lot is open!  Please be careful when walking through as the walkway is still fenced on the sides.  Pavers are being installed in the Community Garden. 

Our new entrance is still fenced off on the sides

Pavers are being installed in the Community Garden

Pavers are being installed in the Community Garden

9/17/2025

 

New, flush, concrete sidewalks are curing!  New bollards to protect the building are in place.  The space is almost ready to have the play equipment installed!

New Concrete walkway around the play area

New Concrete walkway for the entrance and community garden

9/17/2025

 

Curbs are installed and the rest of the area is being graded and prepared for the new, flush, concrete sidewalks.

Concrete forms for the curbs around the community gardenForms for the curbs around the play area

9/2/2025

 

Beginning Tuesday, September 2nd, construction will begin on the Outdoor Play Area and Garden.  Due to sitework, the rear entrance to the library from the parking lot will be closed.  Patrons will need to enter through the front of the building by the cafe or Teen Emergency Exit.  We anticipate this portion of the work to last 2 weeks.  We appreciate your understanding during this phase of construction.

5/15/2025

The Notice to Bidders was printed in the library’s designated papers, The Southampton Press (western edition) and the Long Island Advance in the May 29, 2025 edition.

drawings and proposed installations for the play area